London, 2021
Architect: 6a Architects
Complete
The approach taken was to rebuild as much as possible, demolishing and stripping the old leaky gym back to essential concrete infrastructure, retaining basement floor slabs, ground floor concrete structure, posts and lateral brick walls, to mitigate additional embodied carbon from complete demolition.
The 500m2 building lighting was designed to provide a mix of interchangable and adjustable spot luminaires with potentiometers for curatorial adjustment combined with seperatley switched linear luminaires for for general illuminationn