Creative Centre

Churchill College, Cambridge, 2024
Architect: Assemble

A new exhibition and workshop space to be located within a former oil store for Churchill College at the University of Cambridge. The existing structure was originally designed in 1958 by architects Sheppard Robson + Partners and is now redundant as the college is no longer heated using oil fired boilers.

A lot of effort went into tailoring the custom-designed bronze switches that command a Lutron dimming system, ventilation and towel rails throughout the home.

The approach taken was to rebuild as much as possible, demolishing and stripping the old leaky gym back to essential concrete infrastructure, retaining basement floor slabs, ground floor concrete structure, posts and lateral brick walls, to mitigate additional embodied carbon from complete demolition.

he approach taken was to rebuild as much as possible, demolishing and stripping the old leaky gym back to essential concrete infrastructure, retaining basement floor slabs, ground floor concrete structure, posts and lateral brick walls, to mitigate additional embodied carbon from complete demolition.

he approach taken was to rebuild as much as possible, demolishing and stripping the old leaky gym back to essential concrete infrastructure, retaining basement floor slabs, ground floor concrete structure, posts and lateral brick walls, to mitigate additional embodied carbon from complete demolition.

e approach taken was to rebuild as much as possible, demolishing and stripping the old leaky gym back to essential concrete infrastructure,retaining basement floor slabs, ground floor concrete structu

approach taken was to rebuild as much as possible, demolishing and stripping the old leaky gym back to essential concrete infrastructure,retaining basement floor slabs, ground floor concrete structu

approach taken was to rebuild as much as possible, demolishing and stripping the old leaky gym back to essential concrete infrastructure,retaining basement floor slabs, ground floor concrete structu

approach taken was to rebuild as much as possible, demolishing and stripping the old leaky gym back to essential concrete infrastructure,retaining basement floor slabs, ground floor concrete structu

approach taken was to rebuild as much as possible, demolishing and stripping the old leaky gym back to essential concrete infrastructure,retaining basement floor slabs, ground floor concrete structu